This large block consists of 38 flats.
The existing technical room contained a methane boiler that generated a total power of 426kW for heating only. Separate boilers are used to produce DHW.
E.GEO has installed a geothermal system for the heating function only. 350kW of geothermal energy are generated by one WBT 350G (manufactured by Teon) fed by thirty-five 130m deep geothermal probes.