This large block consists of 31 flats.
The existing technical room contained a methane boiler that generated a total power of 407kW for heating only. Separate boilers are used to produce DHW.
E.GEO has installed a geothermal system for the heating function only. 250kW of geothermal energy are generated by one WBT 250W (manufactured by Teon) fed by two 75m, 180mm intake wells and two 60m, 180mm return wells.