This large residential complex located on Corso Moncenisio in Turin consists of 24 flats.
The existing technical room contained a methane boiler that generated a total power of 255kW for heating only. Separate boilers are used to produce DHW.
E.GEO has installed a geothermal system for the heating function only. 250kW of geothermal energy are generated by one WBT 250G (manufactured by Teon) fed by twenty-one 140m deep geothermal probes.